Planning Blog

 Song: Perfect Day by Hoku

  • Props: 

    • Fancy Bags for us to use at the mall

    • Pillows for a pillow fight at a sleepover

    • Sunglasses we will be at the pool/beach

    • Car Keys to show off a girls trip

  • Costumes: 

    • Party Dresses to try on at the mall

    • Crop Tops & Jeans/Shorts for shopping at the mall

    • Bathing Suits for the pool/beach

    • Pajamas for the sleepover

  • Schedule

    • 11/17 start to storyboard

    • 11/23 go to the mall and start to film

    • 11/24 go to siena’s house and film

    • 11/30 start editing

    • 12/2 finalize project and submit

  • Locations

    • Siena’s House to film the sleepover scenes, pool scenes, and getting ready

    • Mall to film us shopping and trying on different extravagant clothes

    • Beach to film us swimming and having fun

  • Backup Plan:

    • If we cannot film at Siena’s House, we will film at Camille’s

    • If we cannot film at the mall, we will prolong the other scenes

    • If we cannot film at the beach, we will film at the pool

    • If we cannot film on the specified dates, we will find other dates and adjust our timeline

Comments

Popular posts from this blog

Filming With Sofia

Messy Makeup and Crazy Clothes

Group Blog