Planning Blog
Song: Perfect Day by Hoku
Props:
Fancy Bags for us to use at the mall
Pillows for a pillow fight at a sleepover
Sunglasses we will be at the pool/beach
Car Keys to show off a girls trip
Costumes:
Party Dresses to try on at the mall
Crop Tops & Jeans/Shorts for shopping at the mall
Bathing Suits for the pool/beach
Pajamas for the sleepover
Schedule
11/17 start to storyboard
11/23 go to the mall and start to film
11/24 go to siena’s house and film
11/30 start editing
12/2 finalize project and submit
Locations
Siena’s House to film the sleepover scenes, pool scenes, and getting ready
Mall to film us shopping and trying on different extravagant clothes
Beach to film us swimming and having fun
Backup Plan:
If we cannot film at Siena’s House, we will film at Camille’s
If we cannot film at the mall, we will prolong the other scenes
If we cannot film at the beach, we will film at the pool
If we cannot film on the specified dates, we will find other dates and adjust our timeline
Comments
Post a Comment